Project Descriptions
Extension of the general culvert for west Nile`s side station to Abu Rawash lifting station
The works includes : A Culvert with 2 opening 3x2m, 1.6 km length, pass under 26 July corridor, section under the corridor are 3 pipes hydraulic jacking tunnels with 2m diameter, 60m length for each tunnel
Project Details
Client :The Executive Org. for potable water & Sanitary Drainage |
Activity :Utilities |
Location :Abu Rawash, Giza governorate |
Finished in :Nov., 2011 |